Shipment of Electricity Generation Plant from USA to SA

2017-01-25T06:51:58+02:00

CLIENT: IST Energy, a division of IST Holdings (Pty) Ltd PROJECT: Shipment of Electricity Generation Plant from USA to SA IST Energy in partnership with General Electric International awarded the Eskom “Kendal Black Start Facility” (KBSF) project to the project team in May 2006. In addition to the management, planning and coordination of [...]

Construction of Loulo Mine Situated In Mali, West Africa

2017-01-25T06:53:28+02:00

CLIENT: Randgold Resources PROJECT: Construction of Loulo Mine Situated In Mali, West Africa The Freight Forwarding and Logistics scope included the management and planning of the entire logistical requirements and extended to foodstuffs, luxuries and supplies for the project personnel. Sourcing of plant, equipment and raw material was done internationally and required the coordination [...]

Transport of 12000m³ of water piping to Morila Gold Mine in Mali.

2017-01-25T06:54:15+02:00

CLIENT: Randgold Resources PROJECT: Transport of 12000m³ of water piping to Morila Gold Mine in Mali. The scope of this project included the Management, Planning and Co-ordination of the total Freight and Logistics requirement from Supplier in Cape Town to Mine Site in Mali. Goods were procured on an Ex-Works term basis and [...]

Water Rehabilitation Project in 5 States of Nigeria

2017-01-25T06:54:54+02:00

CLIENT: Paterson and Candy PROJECT: Water Rehabilitation Project in 5 States of Nigeria The tonnage transported / shipped from 3 continents totaled 18000m³, with heavy lifts up to 35 tons. The nature of the cargo in the main suggested the utilisation of containers. However, items such as storage tanks and other mixers had [...]

Dismantling and Relocation of Plant from South Africa

2017-01-25T06:55:30+02:00

CLIENT: British American Tobacco Company PROJECT: Dismantling and Relocation of Plant from South Africa To secure the tender, frequent visits had to be made to London. The scope included the dismantling, crating, storage and export of the entire plant to Nigeria. The dismantling and crating took 6 months to complete. It was then [...]

Plant Relocation to Equatorial Guinea and Nigeria

2017-01-25T06:56:14+02:00

CLIENT: Murray & Roberts Construction PROJECT: Plant Relocation to Equatorial Guinea and Nigeria Nigeria Two projects were executed simultaneously by the client in Nigeria. The first was the construction of the USA Embassy in Abuja and the second was the construction of the Shell Camp in the Delta Region. The scope was [...]

Relocation of Bottling Plants to Ghana, Angola, Kenya

2017-01-25T06:56:45+02:00

CLIENT: Amalgamated Beverages PROJECT: Relocation of Bottling Plants to Ghana, Angola, Kenya Apart from the management and planning of the individual projects, an important aspect was the assistance needed with the movement of parts from the established plants to fabricators throughout the country, as well as the rigging requirements at the site. In [...]