The scope of this project included the Management, Planning and Co-ordination of the total Freight and Logistics requirement from Supplier in Cape Town to Mine Site in Mali. Goods were procured on an Ex-Works term basis and as such the responsibility of crating formed part of the logistic scope.

The 12000m³ piping was shipped over a 6 month period utilising 7 charter vessels from Cape Town to Morila Gold Mine site in Mali, via the port of Dakar in Senegal from where it was road transported.